University of Massachusetts North Campus Infrastructure Improvements

Multi-phased replacement of the existing underground steam and condensate return systems supporting multiple buildings with upgrades to improve system performance and longevity. Design provided for 1,125 linear feet of new walkable tunnel containing field fabricated 14? diameter steam and 4? condensate piping, 345 LF of trench (same size direct buried pre-insulated piping), and additional steam piping work within the interior of 10 new or renovated manhole structures.

Amherst, MA

University of Massachusetts, Jason Venditti (413) 577-4769

$ 3.7 million mechanical construction cost

Completed 2010.