L.N. Consulting, Inc. worked directly for Central Vermont Hospital as the prime consultant for the Chilled Water Infrastructure Upgrade Project. The proposed HVAC Infrastructure Upgrade Project included the design and construction of a new 800-ton centrifugal, water-cooled chiller and support infrastructure to support the Central Vermont Hospital. The water chiller is located in existing mechanical space.

Berlin, VT

Central Vermont Medical Center, Amy Slayton (802) 371 4100

Morris Switzer Environments for Health

E.F. Wall

$1.0 million

Completed 2004