Renewable Energy

Green Mountain College Biomass Project

L.N. Consulting completed the design and construction administration of a cogeneration wood chip heating plant for Green Mountain College. The project includes a 400 boiler horsepower steam boiler, 150 kW steam turbine electric generator, and all required auxiliary systems. The new biomass plant will reduce the energy costs to Green Mountain College by approximately $185,000.00 per year. We worked closely with Green Mountain College to develop the project from conceptual design through construction. L.N. Consulting was responsible for submitting the certificate of public good and working directly with CVPS to develop a plan for connection to the utility?s 4.16 kV electrical distribution system. The project is currently in construction phase.

Poultney, VT

Gary Marcy, Green Mountain College, (802) 287 8236

SAS Architects, Steve Smith, (802) 863-2227

H.P. Cummings, Inc.

$5.0 million

Substantially Complete 2010